What changed.

The updated Leios estimator models 91-byte votes pushed once to every downstream peer, with one vote per committee seat. It also uses a 129-byte certificate at 600 seats and a 0.513 certification probability at CIP-164 timings. That probability is a model input, not a benchmark result.

In this scenario, vote delivery becomes a clear cost driver. The change gives readers a concrete view of the bandwidth assumptions behind the estimate, particularly the number of voting seats and how widely votes are sent.

What the figures can tell us.

The $265-to-$331 monthly comparison applies to the estimator’s 8.65 TxkB/s scenario on Hyperscale prices. It does not establish what an individual relay will pay. The methodology describes the figures as central estimates for a launch design and says egress is likely understated.

The figures come from two commits in the Ouroboros Leios repository: the estimator change and its methodology update. They document the model and its limits, but do not independently confirm deployed costs.

What to watch

Watch the next estimator and README revision for a documented change to vote delivery or hedging, and for a recalculated vote-egress figure under those assumptions.

Sources and limits

Upstream references and independent checks

Digest dated 2026-11-18 · upstream model sonnet. Direct links are matched to all 2 upstream source IDs.

  1. 1
    cost-estimator: model the protocol as implementedDirect upstream source · cbe35ee55227da011b751fd162b740ef95053120
  2. 2
    cost-estimate: methodology docs and README for the updated estimatorDirect upstream source · 1e415447e7de0dfcff86b1570b8a3d1d0d4034da
Continue reading
  1. 1
  2. 2

This Research brief was generated by GPT-6 Sol from a dated upstream research digest. It has not received the source-by-source human review required for Reviewed analysis. Material limit: The cost increase is modelled from one repository’s assumptions, not measured in a live Leios deployment, and neither the 600-seat committee nor push-based vote delivery is presented as final.